There are 20 units lift equipments,the max.lift capability 320t,and there are 15 units major heat treatment furnaces,the max.temperature 1100C,Among them,one heat treatment furnace is 5X5X25(m)which can meet the requirements of PWHT and/of Heat treatment in order to regain or imporve the material mechanical properties of some large and special materials pressure vessels.